St Michel (via Acaly)
Food production — Operating production site
Management of a CAPEX project for the full renovation of an active food production area covering two manufacturing lines: 1,000 m² industrial roof, electrical networks, sprinkler system, fume extraction integrated with the lines and interior surface refurbishment. Project structuring without initial specifications or existing as-built documentation: tender package preparation, comparative analysis of 10 technical quotations, coordination of 8 contractors and consolidation of a multi-trade budget above €1.6M excl. VAT. MS Project schedule follow-up with 47 tasks / 8 phases, management reporting and coordination of Production, Maintenance and HSE interfaces to secure technical risks, co-activity and continuity of operations.
- Budget
- >€1.6M excl. VAT
- Geography
- France
- Sector
- Food production — Operating production site
- Role
- Industrial Project Manager




